On the Pengzhou ethylene project "was suggested"

by:


ecocity teacher is now one of Europe's environmental professionals, in my"on the Pengzhou ethylene "Wang Da guidance""paste to make recommendations, then finishing written on the Pengzhou ethylene project's environmental focus, to make a clear and professional guide, as follows ("ecological city "Click here to enter text):

oil refining and ethylene petrochemical project of this type are rather Mature, if there are safety issues, will very likely be a failed operation in strict accordance with the norms.its environmental impact is not the main focus of ethylene and other by-products, but in the waste water from the treatment and disposal, and the resulting impact on the environment. The Pengzhou in the region, not coastal cities to dilute the pollutants conditions (wind and ocean), so pollutants will have to deal with strict and prudent.

a
Body, is the main waste treatment and disposal to do it all well. Pengzhou perennial weak wind, which is likely to lead to emissions of pollutants gathered, the concentration is likely to occupation especially in the fog; wastewater treatment before if
Seepage control measures are not comprehensive, it may Infiltration through the surface, pollution of underground water sources; large number of organic wastewater if not properly be dealt with on emissions would seriously deteriorate the water quality of Tuojiang River, particularly from the lower reaches of protection as irrigation and urban water
This is the source of the river, must have adequate sewage treatment facilities and preparatory programme, in order to avoid because of equipment failure or industrial accidents led to a similar disruption of water streams before the incident. This is very important, but also
Relatively easy problem areas.

these pollutants are basically dealing with corporate spending is not only economic gains. The Sichuan Province, as a result of this project the emission of pollutants diverted the overall share of emissions will increase pressure on the province's emissions. Rectification and not by limiting emissions to meet the target enterprisesthe request of the total emission of pollutants, the effect if not satisfactory, local air quality and the water quality of Tuojiang River is likely to deteriorate further.

taking into account local production and nearby urban citizens, the living environment of security, local economic, business interests and social needs of all factors, the most likely acceptable to all parties is the establishment of viable , Citizens can participate in a transparent monitoring and corrective mechanisms to ensure and enhance the project for the treatment of wastewater emissions.

This may appear to many people it is difficult to achieve the cliches, but remember that Romanian teachers once said: I believe they will eventually change, unless we do nothing. In addition, the EIA on the question units and construction units have disputes over the issue of interest (the construction unit: China Petroleum and Petrochemical Co. Ltd., Sichuan, the evaluation unit: China Petroleum Engineering Group of limited liability companies), this
Point, "the EIA law"does not clearly defined, only in specified in Article 19 of the projects environmental assessment should be identified by the environmental protection departments have qualified technical units to do. As someone suggested to the money from the construction unit, the Department of Environmental Protection
The tender form came to the door of the EIA, in fact suspected to have breached "the EIA law,"because this is likely to ratify the creation of the right to lease space, the EIA law also prohibits the EIA institutions and the approval of the EIA report environmental protection Favourable sector
Beneficial ties.

in actual operation, similar to the oil project in the EIA is often such a situation arise, in part because of the need to project the EIA different industries, the specific operation if the industry does not understand -
Conformation, and people do, the difficulty can be significant. Foreign countries also have similar practices, such as Finland's nuclear power plant by the EIA for the project is the evaluation of nuclear power enterprises to organize. The key point is that environmental protection departments for approval strict and transparent
(This is the Department of Environmental Protection is also continuing efforts, after all even from the expansion of bureaucracy rights point of view, do it now is in its favour), and the agencies responsible for the EIA of a strict legal accountability system
Degrees.

domestic EIA great progress in recent years, more and more high professional standards, which may be why the only announced the EIA abbreviated this part of the reason for it - in order to allow ordinary people to read to understand, of course, can also announced full - This is the better choice.



of:

China's Sichuan 10 million tons of oil/Year refinery project environmental impact report Shujian this

environmental construction projects completed Acceptance technical specifications to protect the ethylene project

another: some of the concerns Pengzhou ethylene project of the blog address (click to enter), welcomed the introduction of new blog.

1,Ran Yunfei gang verbiage and entirely void of it

2,ecocity Ecological City

3,Simon pro-god in mind

4,small of your virtual space

5,Silent Spring

6,see the invisible

7,creation of the new president's Song-M


"to the public the protection of life and property, excessive also understandable. the Government's supervision and criticism, severe and harsh, but also proper meaning."

------ User boicus.